Tuesday, 12 December 2017

Vase 2nd stage

I glazed the interior of the vase & it has finally come out of the kiln after this, its second firing. The lid is back on the shelf waiting for its third firing with the gold lustre I bought & applied to its rim. In the meanwhile I have begun painting the vase with a background to the final design.



Now (Dec 15), with lid. Glazed, gold lustered, & painted in the same French Ultramarine as the vase's base


No comments:

Post a Comment

Boxes gb05

Moved the boxes from Malcolm's to gb05 yesterday. I photographed them, then I cut them up with Photoshop so that I could try different ...